Duration of the project: August, 2016 through December, 2017
Architect: FKP Architects and Polk Stanley Wilcox Architects
General contractor: Nabholz
Products: Kawneer 1600 Curtainwall, Kawneer 451T Storefront, 350 medium stile doors, Vitro Glass & ace Panel System
Special circumstances: The unique part of this project is we had our shop drawings approved, metal and glass purchased and our fabrication started before we ever saw architectural drawings by use of the architects BIM model.
Project summary: The Arkansas Children’s Hospital was a great project for ACE Glass Construction for many reasons. First of all, being selected for this project was an honor for us all. Secondly, The cooperation and dedication of the entire design team and the construction team from the beginning to the very end was absolutely amazing. But the best part of it all, is knowing we played even a small part in creating a facility that works miracles.
God bless our children.