Project Type: Commercial

One Uptown

Products:

  • Kawneer 1600 System 2 with 12” deep covers
  • Kawneer 451T storefront
  • EVO ACM Panel Rainscreen System with Alucobond
  • Kawneer 500 HW Doors
  • Heavy Glass canopy

Highlands Oncology

Products:

    • 35000 sf Kawneer 1600 System 2
    • Kawneer Versoleil Vertical and horizontal sunshades
    • 25000 sf EVO ACM Panel Rainscreen System
    • Typical Glass Guardian SNX51/23
    • Kawneer Medium Stile doors
    • CR Laurence Heavy Glass doors
    • Stanley Handicap Operators
    • Stanley Automatic sliding doors
    • Curtainwall and sunshades were in 2 finishes

Kellogg’s Northgate Plaza

Products:
Kawneer 1600 System 2 with 12” deep covers
EVO ACM Panel Rainscreen System w/ integrated led lighting
Kawneer 350 medium stile doors
Heavy Glass canopy

Hendrix College – Miller Creative Quad

Curtainwall, storefront and aluminum composite panel on a 3 story, 53,446 square foot building with ground floor academic space and 2 levels of student housing above.

This Project features over 11,000 square feet of Kawneer 1620 and 1600 series curtainwall that has a 2” sightline with a 7 ½” back depth. The Curtainwall spans 3 stories and has 7 different types of insulated glass arranged throughout to create the correct amount of natural light in the Art Gallery. The building also features two different areas where the curtainwall turns back into the building to create a glass soffit. The first floor boasts 5,950 square feet of Kawneer 451T front set storefront. Alucoil aluminum composite panel covers the first-floor north side of the building and also wraps the South wing balcony in a custom Hendrix orange color. There are also 82 Weather Shield vinyl windows on the second and third floors of the building.

Robinson Auditorium

Duration of the project: April, 2015 through July, 2016

Architect: Polk Stanley Wilcox Architects

General contractor: CDI

Products: Larson by Alucoil ACM Panels (7,000sf), APS wet and dry-set panel systems, OBE Reliance wall, 2” x 6”, 2 ½” x 7 ¼” and 2 ½” x 10 1/8” systems, OBE Wide stile doors, OBE FG3000T and FG2000 series systems, Tristar Glass ½” tempered (5,000sf), SN-54 IG’s (15,000sf), CRL Smoke Baffle and Railing assemblies, Total Door Systems, McKeon Fire Curtains, Mon-Ray audio control windows

Special circumstances: Part of Hwy 10/LaHarpe Ave had to be closed to access the North side of the building.  Large East elevation has 1 ½” x 4” steel bar in the mullions to meet loading requirements.  The stairs and smoke glass was segmented to match the arc of the historic lobby area.

21c Museum Hotel

Duration of the project: November, 2011 through January, 2013

Architect: Polk Stanley Wilcox

General contractor: Flintco

Products: Kawneers 1600 curtainwall, Trifab 451T, 350 medium stile doors, 1040 Sliding glass doors, sunshades, Paragon All Glass Walls.

Special circumstances: Working with design team to help protect the art with UV filtering glass products.

Midtown Center

Duration of the project: October, 2013 through November, 2015

Architect: SA+R Architects

General contractor: Flintco

Products: Kawneer 1600 curtainwall, Kawneer 451t storefront, PPG Glass, Kawneer Sunshades

 

 

XNA Parking

Duration of the project: March, 2017 through July, 2018

Architect: Desman Inc.

General contractor: Nabholz

Products: Vertical Louver System by Construction Specialties

Arkansas Children’s Northwest

Duration of the project: August, 2016 through December, 2017

Architect: FKP Architects and Polk Stanley Wilcox Architects

General contractor: Nabholz

Products: Kawneer 1600 Curtainwall, Kawneer 451T Storefront, 350 medium stile doors, Vitro Glass & ace Panel System

Special circumstances: The unique part of this project is we had our shop drawings approved, metal and glass purchased and our fabrication started before we ever saw architectural drawings by use of the architects BIM model.

Project summary: The Arkansas Children’s Hospital was a great project for ACE Glass Construction for many reasons. First of all, being selected for this project was an honor for us all. Secondly, The cooperation and dedication of the entire design team and the construction team from the beginning to the very end was absolutely amazing. But the best part of it all, is knowing we played even a small part in creating a facility that works miracles.

God bless our children.

Hunt Chapel

Duration of the project: October, 2010 through September, 2012

Architect: Maurice Jennings Architects

General contractor: Baldwin Shell

Products: PPG Insulated glass set in channels and concealed by stone, Kawneer 1600 Skylite

Special circumstances: Many challenges setting the glass many times with stone in the way.

Crystal Bridges Tower

Duration of the project: February, 2016 through March, 2017

Architect: Hight Jackson

General contractor: Flintco

Products: ACE Glass Panel System in custom application, Kawneer Trifab 451T and medium stile doors

Special circumstances: Coordination of the raw true copper panels from Spain

J.B. Hunt Transport Services

Duration of the project: April, 2015 through July, 2017

Architect: Miller Boskus Lack Architects

General contractor: Nabholz

Products: Kawneers 1600 SSG Curtainwall, Kawneer Trifab 651T & Medium stile doors, Various All Glass applications, SAGE Glass

Special circumstances: Coordinating the wiring of the SAGE Glass and 25 other glass products

Fayetteville High School

Duration of the project: March, 2012 through April, 2014

Architect: Marlon Blackwell and Hight Jackson

General contractor: Nabholz

Products: Kawneer 1600 curtainwall, Sunshades, Trifab 451T, 350 mediums stile doors

Hunt Tower

Duration of the project: August, 2014 through December, 2015

Architect: Core Architects

General contractor: Crossland Construction

Products: Kawneer 1600 SSG, ACE Glass Panel System in custom application, Crane Revolver and many interior glass applications

Special circumstances: Worked very closely with Crossland as we were installing curtainwall 2 floors below the where they were pouring the concrete floors.

CARTI Cancer Center

Duration of the project: October, 2014 through December, 2016

Architect: Perkins and Will

General contractor: Nabholz Construction

Products: Curtainwall, ACM, Fry Reglet Glass wall panels, Glass Drive through canopy, Interior storefront and all glass partitions.

Bryant High School

Duration of the project: March, 2011 through July, 2012

Architect: Jackson Brown King Architects

General contractor: Cone Construction

Products: ACM Intrabond Aluminum Composite panel, Rustic Copper Metallic, Caulking Champagne Dow

Southwestern Energy

Architect: HOK

General contractor: Choate Construction Co.

Project summary: High-performance glass and glazing help boost energy performance by providing natural daylight at the Southwestern Energy Office Building in Conway, Ark. The 122,000-square-foot, four-story building clad in glass, brick, stone and metal panels was designed to achieve Gold certification from the U.S. Green Building Council’s Leadership in Energy and Environmental Design program, according to an article in South Central Construction.

UAMS

UAMS has updated its facility to provide the latest in patient care, including private neonatal intensive care rooms, interventional radiology and an emergency department built to handle large-scale disasters and public health emergencies.

HKS Inc., Dallas, served as lead design firm for the project, with architect of record Polk Stanley Wilcox Architects, Little Rock. The design takes its cues from the true modernist flavor of the medical center’s original midcentury buildings, says Kyley Harvey, AIA, practice leader, HKS. The stylistic patterns of the original facility are reflected in the uninterrupted lines of the new building’s stair towers, brickwork and glazing. This approach is carried through in the clean details of the interior design, like the simple horizontal lines of the pendant lighting fixtures in the lobby.

Arcade Building

Duration of the project: April, 2013 through February, 2014

Architect: AMR Architects

General contractor: Clark Contractors

Products: Glass, Aluminum Framing, Aluminum Entrances (some clad with stainless steel), Nanawall, ACM panel, glass handrail, stainless steel railing

Special circumstances: Three separate contracts covering the core and shell, the theater, and the restaurant.

Heifer International

Duration of the project: September, 2004 through January, 2006

Architect: Polk Stanley Wilcox

General contractor: CDI

Products: Glass, Curtainwall, ACM panel, ACM sunshades, Handrail, Interior Storefront, Aluminum Corrugated Sheet, Entrances

Special circumstances: LEED Platinum project

Arkansas Children’s Hospital

Duration of the project: June, 2010 through March, 2013

Architect: Cromwell Architects Engineers

General contractor: Nabholz Construction

Products: ACM Kawneer Metal System missle Unique Design of a roller coaster Curtainwall 

Southwest Power Pool

ACE Glass - Southwest Power Pool

Duration of the project: May, 2011 through June, 2012

Architect: Witsell Evans Rasco

General contractor: Nabholz LR

Products: Tristar Glass, EFCO aluminum framing, entrances, and sunshades, TGP fire rated glass, RACO interior aluminum framing, Intrabond ACM panel, CR Laurence spider glass hardware, Dow Corning sealants

Special circumstances: Three separate contracts for the different segments of the project all occurring simultaneously (Ops Building, Office Building, and Parking Deck). Aluminum sunshades and exterior heavy glass suspended from steel structure projecting from the west side of the building.

Vol Walker Hall at the University of Arkansas

Duration of the project: November, 2011 through December, 2013

Architect: Marlon Blackwell and Polk Stanley Wilcox

General contractor: Baldwin Shell

Products: Kawneers 1600 curtainwall, custom veneer curtainwall, Mediums stile doors and Balanced doors and a variety of All Glass products including a 20’ x 9’ skylite (one piece of glass)

Special circumstances:  Worked with architects and contractor to establish a custom veneer curtainwall to help bring the project into budget. Setting a single piece of glass on the roof weighing in at 3750 pounds