Products:
- Kawneer 1600 System 2 with 12” deep covers
- Kawneer 451T storefront
- EVO ACM Panel Rainscreen System with Alucobond
- Kawneer 500 HW Doors
- Heavy Glass canopy
Products:
Products:
Products:
Kawneer 1600 System 2 with 12” deep covers
EVO ACM Panel Rainscreen System w/ integrated led lighting
Kawneer 350 medium stile doors
Heavy Glass canopy
Curtainwall, storefront and aluminum composite panel on a 3 story, 53,446 square foot building with ground floor academic space and 2 levels of student housing above.
This Project features over 11,000 square feet of Kawneer 1620 and 1600 series curtainwall that has a 2” sightline with a 7 ½” back depth. The Curtainwall spans 3 stories and has 7 different types of insulated glass arranged throughout to create the correct amount of natural light in the Art Gallery. The building also features two different areas where the curtainwall turns back into the building to create a glass soffit. The first floor boasts 5,950 square feet of Kawneer 451T front set storefront. Alucoil aluminum composite panel covers the first-floor north side of the building and also wraps the South wing balcony in a custom Hendrix orange color. There are also 82 Weather Shield vinyl windows on the second and third floors of the building.
Duration of the project: April, 2015 through July, 2016
Architect: Polk Stanley Wilcox Architects
General contractor: CDI
Products: Larson by Alucoil ACM Panels (7,000sf), APS wet and dry-set panel systems, OBE Reliance wall, 2” x 6”, 2 ½” x 7 ¼” and 2 ½” x 10 1/8” systems, OBE Wide stile doors, OBE FG3000T and FG2000 series systems, Tristar Glass ½” tempered (5,000sf), SN-54 IG’s (15,000sf), CRL Smoke Baffle and Railing assemblies, Total Door Systems, McKeon Fire Curtains, Mon-Ray audio control windows
Special circumstances: Part of Hwy 10/LaHarpe Ave had to be closed to access the North side of the building. Large East elevation has 1 ½” x 4” steel bar in the mullions to meet loading requirements. The stairs and smoke glass was segmented to match the arc of the historic lobby area.
Duration of the project: November, 2011 through January, 2013
Architect: Polk Stanley Wilcox
General contractor: Flintco
Products: Kawneers 1600 curtainwall, Trifab 451T, 350 medium stile doors, 1040 Sliding glass doors, sunshades, Paragon All Glass Walls.
Special circumstances: Working with design team to help protect the art with UV filtering glass products.
Duration of the project: October, 2013 through November, 2015
Architect: SA+R Architects
General contractor: Flintco
Products: Kawneer 1600 curtainwall, Kawneer 451t storefront, PPG Glass, Kawneer Sunshades
Duration of the project: March, 2017 through July, 2018
Architect: Desman Inc.
General contractor: Nabholz
Products: Vertical Louver System by Construction Specialties
Duration of the project: August, 2016 through December, 2017
Architect: FKP Architects and Polk Stanley Wilcox Architects
General contractor: Nabholz
Products: Kawneer 1600 Curtainwall, Kawneer 451T Storefront, 350 medium stile doors, Vitro Glass & ace Panel System
Special circumstances: The unique part of this project is we had our shop drawings approved, metal and glass purchased and our fabrication started before we ever saw architectural drawings by use of the architects BIM model.
Project summary: The Arkansas Children’s Hospital was a great project for ACE Glass Construction for many reasons. First of all, being selected for this project was an honor for us all. Secondly, The cooperation and dedication of the entire design team and the construction team from the beginning to the very end was absolutely amazing. But the best part of it all, is knowing we played even a small part in creating a facility that works miracles.
God bless our children.
Duration of the project: October, 2010 through September, 2012
Architect: Maurice Jennings Architects
General contractor: Baldwin Shell
Products: PPG Insulated glass set in channels and concealed by stone, Kawneer 1600 Skylite
Special circumstances: Many challenges setting the glass many times with stone in the way.
Duration of the project: February, 2016 through March, 2017
Architect: Hight Jackson
General contractor: Flintco
Products: ACE Glass Panel System in custom application, Kawneer Trifab 451T and medium stile doors
Special circumstances: Coordination of the raw true copper panels from Spain
Duration of the project: April, 2015 through July, 2017
Architect: Miller Boskus Lack Architects
General contractor: Nabholz
Products: Kawneers 1600 SSG Curtainwall, Kawneer Trifab 651T & Medium stile doors, Various All Glass applications, SAGE Glass
Special circumstances: Coordinating the wiring of the SAGE Glass and 25 other glass products
Duration of the project: March, 2012 through April, 2014
Architect: Marlon Blackwell and Hight Jackson
General contractor: Nabholz
Products: Kawneer 1600 curtainwall, Sunshades, Trifab 451T, 350 mediums stile doors
Duration of the project: August, 2014 through December, 2015
Architect: Core Architects
General contractor: Crossland Construction
Products: Kawneer 1600 SSG, ACE Glass Panel System in custom application, Crane Revolver and many interior glass applications
Special circumstances: Worked very closely with Crossland as we were installing curtainwall 2 floors below the where they were pouring the concrete floors.
Duration of the project: October, 2014 through December, 2016
Architect: Perkins and Will
General contractor: Nabholz Construction
Products: Curtainwall, ACM, Fry Reglet Glass wall panels, Glass Drive through canopy, Interior storefront and all glass partitions.
Duration of the project: March, 2011 through July, 2012
Architect: Jackson Brown King Architects
General contractor: Cone Construction
Products: ACM Intrabond Aluminum Composite panel, Rustic Copper Metallic, Caulking Champagne Dow
Architect: HOK
General contractor: Choate Construction Co.
Project summary: High-performance glass and glazing help boost energy performance by providing natural daylight at the Southwestern Energy Office Building in Conway, Ark. The 122,000-square-foot, four-story building clad in glass, brick, stone and metal panels was designed to achieve Gold certification from the U.S. Green Building Council’s Leadership in Energy and Environmental Design program, according to an article in South Central Construction.
UAMS has updated its facility to provide the latest in patient care, including private neonatal intensive care rooms, interventional radiology and an emergency department built to handle large-scale disasters and public health emergencies.
HKS Inc., Dallas, served as lead design firm for the project, with architect of record Polk Stanley Wilcox Architects, Little Rock. The design takes its cues from the true modernist flavor of the medical center’s original midcentury buildings, says Kyley Harvey, AIA, practice leader, HKS. The stylistic patterns of the original facility are reflected in the uninterrupted lines of the new building’s stair towers, brickwork and glazing. This approach is carried through in the clean details of the interior design, like the simple horizontal lines of the pendant lighting fixtures in the lobby.
Duration of the project: April, 2013 through February, 2014
Architect: AMR Architects
General contractor: Clark Contractors
Products: Glass, Aluminum Framing, Aluminum Entrances (some clad with stainless steel), Nanawall, ACM panel, glass handrail, stainless steel railing
Special circumstances: Three separate contracts covering the core and shell, the theater, and the restaurant.
Duration of the project: September, 2004 through January, 2006
Architect: Polk Stanley Wilcox
General contractor: CDI
Products: Glass, Curtainwall, ACM panel, ACM sunshades, Handrail, Interior Storefront, Aluminum Corrugated Sheet, Entrances
Special circumstances: LEED Platinum project
Duration of the project: June, 2010 through March, 2013
Architect: Cromwell Architects Engineers
General contractor: Nabholz Construction
Products: ACM Kawneer Metal System missle Unique Design of a roller coaster Curtainwall
Duration of the project: May, 2011 through June, 2012
Architect: Witsell Evans Rasco
General contractor: Nabholz LR
Products: Tristar Glass, EFCO aluminum framing, entrances, and sunshades, TGP fire rated glass, RACO interior aluminum framing, Intrabond ACM panel, CR Laurence spider glass hardware, Dow Corning sealants
Special circumstances: Three separate contracts for the different segments of the project all occurring simultaneously (Ops Building, Office Building, and Parking Deck). Aluminum sunshades and exterior heavy glass suspended from steel structure projecting from the west side of the building.
Duration of the project: November, 2011 through December, 2013
Architect: Marlon Blackwell and Polk Stanley Wilcox
General contractor: Baldwin Shell
Products: Kawneers 1600 curtainwall, custom veneer curtainwall, Mediums stile doors and Balanced doors and a variety of All Glass products including a 20’ x 9’ skylite (one piece of glass)
Special circumstances: Worked with architects and contractor to establish a custom veneer curtainwall to help bring the project into budget. Setting a single piece of glass on the roof weighing in at 3750 pounds