Heifer International

Duration of the project: September, 2004 through January, 2006

Architect: Polk Stanley Wilcox

General contractor: CDI

Products: Glass, Curtainwall, ACM panel, ACM sunshades, Handrail, Interior Storefront, Aluminum Corrugated Sheet, Entrances

Special circumstances: LEED Platinum project

Arkansas Children’s Hospital

Duration of the project: June, 2010 through March, 2013

Architect: Cromwell Architects Engineers

General contractor: Nabholz Construction

Products: ACM Kawneer Metal System missle Unique Design of a roller coaster Curtainwall 

Southwest Power Pool

ACE Glass - Southwest Power Pool

Duration of the project: May, 2011 through June, 2012

Architect: Witsell Evans Rasco

General contractor: Nabholz LR

Products: Tristar Glass, EFCO aluminum framing, entrances, and sunshades, TGP fire rated glass, RACO interior aluminum framing, Intrabond ACM panel, CR Laurence spider glass hardware, Dow Corning sealants

Special circumstances: Three separate contracts for the different segments of the project all occurring simultaneously (Ops Building, Office Building, and Parking Deck). Aluminum sunshades and exterior heavy glass suspended from steel structure projecting from the west side of the building.

Vol Walker Hall at the University of Arkansas

Duration of the project: November, 2011 through December, 2013

Architect: Marlon Blackwell and Polk Stanley Wilcox

General contractor: Baldwin Shell

Products: Kawneers 1600 curtainwall, custom veneer curtainwall, Mediums stile doors and Balanced doors and a variety of All Glass products including a 20’ x 9’ skylite (one piece of glass)

Special circumstances:  Worked with architects and contractor to establish a custom veneer curtainwall to help bring the project into budget. Setting a single piece of glass on the roof weighing in at 3750 pounds